Features

Everything you need for a faster, more thorough tender review

DolanQS extracts every document, cross-references the package and produces a traceable register of potential issues.

MODULE A

Drawings vs Specification

Compares architectural, structural and M&E drawings and schedules with the written specification.Requires: At least one drawing or schedule and one specification.

  • Specified products and performance requirements not shown on drawings or schedules
  • Fire, acoustic and thermal ratings that conflict
  • Drawing notes contradicting specification clauses
MODULE B

Drawings vs Bill of Quantities

Finds items missing from the BoQ, quantity differences, duplicates and inconsistent descriptions.Requires: At least one drawing or schedule and one Bill of Quantities.

  • Items on drawings but not in the BoQ, and vice versa
  • Quantity differences against scheduled counts
  • Duplicate items and inconsistent descriptions
MODULE C

Drawing Revision Comparison

Identifies added, removed and changed elements between revisions of the same drawing.Requires: Two or more revisions of the same drawing.

  • Added and removed elements
  • Changed dimensions, layouts and specification notes
  • Clear statement of limitations where visual comparison isn't reliable
MODULE D

Contractor Quotation Review

Extracts exclusions, qualifications, provisional sums and unpriced items from quotations.Requires: At least one contractor quotation.

  • Exclusions, qualifications and assumptions
  • Provisional sums and unpriced items
  • Work in the tender scope missing from the quotation
MODULE E

Scope Gap Analysis

Flags work implied by the tender (builders' work, fire stopping, access, testing) that isn't clearly included.Requires: Any tender documents — best with a BoQ or quotation.

  • Builders' work in connection with M&E
  • Fire stopping, access equipment, making good
  • Testing & commissioning, temporary works, protection, waste removal
MODULE F

Contractual Risk Review

Highlights unusual or onerous provisions in JCT and other contract documents, with clause references.Requires: At least one contract document.

  • Payment provisions, programme obligations and damages
  • Variations procedures and design responsibility
  • Potentially unusual commercial provisions with clause references

Platform capabilities

Document extraction & OCR

Reads PDFs, Excel/CSV BoQs, Word and images. Captures drawing numbers, revisions, issue dates, page counts, schedules and stated quantities. Scanned files are read with AI OCR.

Discrepancy register

Every finding gets a reference, category, source document and page, risk level, recommended action, AI confidence and review status. Filter, assign, comment, accept or reject.

Automatic RFIs

Turn findings into professionally worded RFIs with document references, the clarification required and potential implications. Edit, then export to Word or PDF.

Financial exposure

Where quantities and rates exist in the documents, DolanQS estimates potential exposure — clearly separating confirmed quantities from AI estimates. Otherwise it says the value can't be determined.

Branded reports

Tender Intelligence Report, Detailed Discrepancy Schedule, Scope Gap Report, Quotation Comparison and RFI Schedule — in PDF and editable Excel.

Private by design

Documents are stored privately per organisation, encrypted in transit and at rest, never used for model training, and can be deleted at any time.

What DolanQS does not do (yet): it does not measure from CAD/DWG files, it does not provide legal advice, and its findings are not confirmed errors — they are prompts for professional review.